Brick Yard Manhole
LOCATION Columbus, OH
PROBLEM
- This manhole was in a masonry brick yard that was used for waste pumping and required reclamation due to contamination
- The 3 year-old concrete unit required extensive maintenance due to exposure to corrosive liquids
SOLUTION
- Replacement with a custom, fabricated 36” diameter HDPE sump with specified number and positions of penetrations
IMPACT TO CUSTOMER
- Viable system for collection of material from various plant locations
- Corrosion resistant sump